Thursday, October 9, 2014

21 Days

21 Days until we receive the keys to our house!  Time has flown by and a lot of progress has been made.  Our PM has continued to be great and the level of communication and follow up has exceeded our expectations thus far.

Over the last few weeks we've been able to get into the house after work on our own, however they recently started locking up our house and we can't get in on our own, which is probably a good thing. Today we took some time during the day to stop by and check out the progress.

Here are a few updates on what has been done over the last week and a few pictures that we took today.


  • Hardwood floors have been installed
  • Kitchen Cabinets have been installed
  • Granite will be installed next week
  • Ceramic Shower being installed today
  • Drywall and paint touch-ups to occur tomorrow, Monday, and Tuesday
  • Stone Fireplace will be installed next Tuesday
  • Electrical, HVAC, and fixtures will start to be done next week
  • Siding and stone front will be installed next Monday and Tuesday
  • Gas Meter hooked up
Front

Walkway and Stoop

Bunch o' Stuff in the Garage

Kitchen Cabinets

Kitchen - our hardwood is protected with cardboard

Living Room

Bedroom

Another Bedroom Pic

Master Bathroom - If you look closely you can see the tile around the tub
 
Master Bedroom

Tools and Bathroom Tile


1 comment:

  1. Looks great! You're lucky! They put our cabinets in before laying our floors:-(
    Not too much longer now for either of us.

    ReplyDelete